top of page
Cover Photo.jpg

IRON HORSE TRENCHING

Premier One-Pass Trenching

No Open Excavation

One-pass trenching is a unique and specialized installation that may be the only means or method rather than deep excavations, in poor soil conditions, elevated water tables and varying other conditions.

About Iron Horse

We aspire to be recognized as the leader in our industry.

We are committed to providing the highest value to our customers, our people and our community. 

Our company’s foundation is built on our values and we consistently deliver the highest quality service in a safe environment that exhibits teamwork, innovation, and sustainable practices.

WHO WE ARE

WHAT WE DO

One-Pass Trenching Services

Need more details?

Contact us

We are here to assist. Contact us by phone, email or via our Social Media channels.

CIty of Edmonton

Coal Ash Dewatering project, installation of 1,600 lf of drain tile buried 38 ft deep with no open excavation.

SUNCOR ENERGY

Installation of  3,000 linear feet of drain tile twenty feet below ground surface at Fort McMurray to mitigate tailing dike seepage.

MOSAIC

Stabilization project with installation of 12,000 feet of corrugated pipe and engineered backfill collection trench to mitigate ground water seepage.

WHAT WE DO

One-Pass Trenching Services

HDPE Barrier Wall

Installation of PVC & HDPE Pipe

Conduit- Fiber- Gas- Electrical

Water Line

Corrugated Pipe with Filter Sock

Direct Bury Drains

Sub-surface Drains

Bio Walls

Funnel & Gate Walls

Collection Trenches

Dewatering Trenches

Seepage Control

Permeable Reactive Barrier Walls

Soil Vapor Extraction Walls

Air Sparge Trench

Soil Bentonite Wall

Soil Cement Bentonite Wall

Cutoff Wall for Groundwater Control

bottom of page